Friday, February 24, 2012

Construction Continues at Smithtown

The expanded portion of the building nears completion.


Close-up of the new entrance that shows the new roof design.


The Main Reference Room is shown with new heating, ventilation and air conditioning duct work along with new windows and doors.


The new Periodicals Room which was formerly the Children's Room. This was the original Library built in 1912.


Interior area of the new Children's Room highlighting the new HVAC duct work.



Work Continues at the Kings Park Branch

The newly constructed future entrance to the Kings Park Branch.


The expanded front portion of the building nears completion.


A view of the Main Level taken from the mezzanine.



The interior of the future Children's Department showing the recently installed heating, ventilation and air conditioning duct work.


Due to the unusually warm temperatures we have been experiencing this winter, the contractor was able to pave the parking field.