Monday, July 26, 2010

Nesconset Roof and Skylights Are Ready To Be Installed


A view of the metal structure that is part of the upper walls within the Main Reading Room.



The roofing material has arrived and is ready for installation.



A worker prepares the framework prior to the installation of the skylights in the Main Reading Room.

A view into the Main Reading Room from the new Children's Room.



Commack Exterior Walls Taking Shape!

The walls of the new Children's Department are almost finished!



Wednesday, July 14, 2010

Interior and Exterior Work Continues at Nesconset

The opening for the new circular window has been cut. The future main entrance becomes visible and the framework for the new portico has been installed. The old outer doors have been converted into windows flanking the new doorway.

A construction worker cuts the metal 2x4 studs which will be installed by other workers.

Two workers installing the metal studs on the walls.

A view from the future Children's Department into the new Meeting Room.




Commack Children's Department Walls Are Going Up!

The walls of the new Children's Department are beginning to take shape.

A worker relocates the scaffolding as he continues to work on the wall.

Thursday, July 1, 2010

Nesconset Brickwork and Interior Walls Have Been Installed



A maze of metal studs and utility pipes have been installed on the main level of the new Nesconset Branch.




The former rifle range has also received metal studs and is being transformed into valuable space.



A worker applies the finishing touches on the brickwork at the top of the chimney.



Commack Branch Starting to Take Shape!


Previously, the concrete was poured and left to cure. This is the location of the future Children's Department. The walls will be set in place in the coming days.



Looking out the old main door toward the new Children's Department.



The new elevator shaft begins to take shape. This elevator will make the building fully handicapped accessible.