Smithtown Foundation Floor Finished


The vapor barrier for the foundation floor is being installed. This vapor barrier will prevent any moisture from seeping into the lower level.



The vapor barrier is in place and rebar has been installed prior to pouring the concrete.


Workers pour the concrete and level the surface.


The concrete floor has been poured and has begun to cure.



A worker puts the final touches on the floor surface.