
The wooden forms are installed in preparation for the pouring of the concrete footings.

The final preparation phase before pouring the concrete was the placement of rebar inside the forms.
Concrete is being poured into the forms that will soon become the footings.
A worker is shown smoothing out the concrete.
The pouring of the concrete is complete and will be allowed to cure. Once the concrete is cured, the walls will be poured.