The stone facade has been completed on the entire building. This photo features the new expanded entrance to the Commack Branch.
Interior metal studs have been installed throughout the building. The wall board will be attached in the near future. These windows will allow much more natural light into the building.
The new elevator shaft nears completion. This replaces the old lift which needed constant repair and replacement parts were no longer available. This now brings it up to modern standards.
An interior view of the Children's Department. Large windows will be installed in the very near future allowing for an abundance of natural light to enter the room.