
The interior walls are taking shape in the future Main Room. The hole cut in the wall is for a window that will add more natural light to the building.

A birds-eye view! The roof nears completion and the metal trim work has been attached to the new facade. The framework for the skylights is in place, and once completed, will allow more natural light into the building. The large stacks shown are roofing material that is being installed.

A view taken towards Smithtown Blvd. shows the installation of the water main to the building.