Wednesday, July 14, 2010

Interior and Exterior Work Continues at Nesconset

The opening for the new circular window has been cut. The future main entrance becomes visible and the framework for the new portico has been installed. The old outer doors have been converted into windows flanking the new doorway.

A construction worker cuts the metal 2x4 studs which will be installed by other workers.

Two workers installing the metal studs on the walls.

A view from the future Children's Department into the new Meeting Room.